GIOD - Database Status
Over 200,000 fully simulated di-jet events in the database
Population continuing using parallel jobs on the Exemplar (from a pool of over 1,000,000 events simulated)
Preparing for WAN test with SDSC
Completed HPSS/AMS installation - starting tests
For MONARC: Made a GIOD replica at Padua/INFN